Professional Plastic Polyester/PET Synthetic Broom Bristles/Hair/Wire Machine Factory
General Description
PET/PP monofilament/yarn/fiber making machine is used to produce PET, PP, PE round yarn monofilament with 100% recycled materials. The plastic filament can be used to make broom, brush, and rope for industrial and civil use.
Features
1. Most experienced manufacturer: Professional and mature technology in China
2. Green and Eco-friendly: 100% recycled PET bottle scraps for PET filament
3. Machine Development: Improvement and feedback from Customers all around China and the world
4. Multifunction: multi-purpose machine of filament for broom, rope, nets, etc.
5. Better performance: low energy consumption, high production capability
6. Operation: Easy and convenient operation saves labors
Main Model Types
Model |
ZYLS-75 |
ZYLS-80 |
ZYLS-90 |
Screw L/D |
30:1 |
30:1 |
30:1 |
Gearbox model |
200 |
225 |
225 |
Main motor |
18.5kw |
22/30kw |
30/37kw |
Capacity(kg/h) |
80-100kg |
100-120kg |
120-140kg |
Mould Dia. |
200 |
200 |
200 |
Filament Dia. |
0.05-2.5mm |
0.05-2.5mm |
0.05-2.5mm |
Equipment Configuration List
No. |
Name |
Quantity |
1 |
SJ75/SJ80/SJ90 single screw extruder |
One set |
2 |
Die head |
One set |
3 |
Water-cooling tank |
One set |
4 |
First tensile machine |
One set |
5 |
Pre-heating machine |
One set |
6 |
Second tensile machine |
One set |
7 |
Third tensile machine |
One set |
8 |
Oil bath tank |
One set |
9 |
Pneumatic tensioner |
One set |
10 |
Two position winder |
One set |
Production Procedure
Automatic material loader→high efficiency extruder→screen changer→spineret(mould)→cooling water tank→first pulling and stretching unit→hot water tank→second pulling and stretching unit→oil coating→winding→shaping→cutting.
Application
House broom filament , cleaning brush filament, Christmas tree needle filament, and safety net yarn etc.
Machine Related Pictures
Service
Pre-service:
Professional engineers to provide pre-sales technical advice and guidance supporting the planning, such as unit selection, matching, room design, answer difficult questions encountered by the user during use and provide technical guidance.
The sale:
Our company will send professional and technical personnel to the installation site for installation and commissioning of the unit after receiving user notification , and do a good job with the user acceptance.
Standard unit responsible for guiding installation, commissioning.
After-service:
The warranty period: from the date of acceptance or the date of one year warranty accumulated 1,000 hours (whichever occurs both), as a result of parts factory assembled negligence or improper design and selection of raw materials and other reasons caused the damage or other unit fault, may be responsible for the warranty by the supplier.
Company Information
Contact
Sales Manager: Ms. Lucia
Web: zyaextruder.en.made-in-china.com